Order was accepted by the plant 1/25/10. Should be ready sometime in March.
Here's the pricing:
I skipped the glass roof and shaker 1000 to lose a couple pounds. Did opt for the electronics package though.
Here's the pricing:
I skipped the glass roof and shaker 1000 to lose a couple pounds. Did opt for the electronics package though.